Refrigeration Assembly And Maintenance Accessories .
The unit trainees can learn working within a complex project. This involves the planning, implementation and checking of processes related to assembly, commissioning and maintenance. The assembly relates to refrigeration installation: installation of the LP and HP pressure switches, the expansion valve and the pipework of the refrigeration circuit. The pipe joints are not soldered but bolted. The electro technical installation includes the wiring and connection of all units and switching elements.
The experiment is arranged on a workbench with drawers for storing the components and tools. Assembly panel and refrigeration chamber are mounted on a frame. Frame, condensing unit and switch cabinet are bolted permanently to the working surface. The refrigeration and electrical components are attached to the aluminum assembly panel.
FEATURES:
Planning and executing assembly steps and processes
Making pipe joints in accordance with a system diagram
Carrying out electrical installation in accordance with a circuit diagram
Filling and evacuating of the refrigeration system
Commissioning and checking the refrigeration system after successful assembly
Assembly of a refrigeration system from individual components
SPECIFICATION:
Condensing unit
Power consumption: 190W
Refrigeration capacity: 373W at 5°C evaporation temperature
Receiver: approx. 1L
Show case evaporator
Capacity: 50W at t0=-6°C, ΔT=8K
Transfer area: 1,06m2
Refrigeration chamber with sight window
LxWxH: 480x280x390mm
Aluminum assembly panel
LxW: 710x500mm
Thermostatic expansion valve, adjustable
Thermostat, adjustable: -30…15°C
Required for operation
230V, 50Hz, 1 phase
230V, 60Hz, 1 phase