Cooling Tower 115kW .
Cooling Tower 115kW
Specification : Cooling Tower 115kW
- Wet cooling tower with fan and pump for operation
- Use of corrosion-resistant materials
- Water flow measurement at the inlet and outlet
- Combined temperature/humidity measurement
Technical Data
Cooling tower
- Cooling capacity approx. 115kW
- Water flow rate 9m³/h
- Fan max.: 3900m³/h at 1450min-1
- Pump max.: 19,2m³/h
Measuring ranges
- Temperature: 2x -10...50°C, 2x 0...80°C
- Humidity: 2x 5...95% r.h.
- Pressure: 1x 0...2,5bar, 1x 0...6bar
- Flow rate: 0...20m³/h